HP Roofing, 2nd visit

Hi please look at the pictures of some of the work performed to date we installed 175 feet of heat tape and worked a total of 44 hours $6,052.25 to date we still need about 12 hours to complete remaining repairs install a few gutters a downspout and some gutter hangers an additional $1,268.00 with materials

HP Roofing, 1st visit

From HP Roofing: Hi Everybody After todays visit We found must of the roof jacks with damage and in need of repair there is also some damage along the roof some from snow removal or due to shingles being to old shingles are in fair condition high profile roofing recommends start thinking on new roofs, to repair, clean up gutters replace roof jacks we need about another 32 additional hours please […]

Thank you Josh and Susan!

Josh and Susan for limbing the trees around the cul-de-sac parking island. The work of putting the branches in the dumpster. Thank you so much for putting the elbow grease into our neighbor hood.

Sept 5th Exterior paint Update.

Dear neighbors,  Jason and Simon have as of today started prepping, scraping, hammering in nails and replacing where needed with screws in the studs. As the project will gain momentum into this week his crew will see a few extra hands. Make them feel welcome in accommodate as directed. Ask for help as I’ll be around. Altogether the project could be as long as 3 to 4 weeks. Please be […]

Progress update exterior painting

Today Jason pressure washed buildings 100 and 200 and tomorrow will be working on the 300 building. We are aware that even the windows are closed. Some water might be getting through. we have passed this information on to, Jason and he will be mindful of it. Just in case, please be prepared with some towels handy. Please let Polo or myself know if there are any issues.

Exterior painting townhomes

Please find attached a bid from Jason Dilbeck, the proprietor of Aspen Highlands Painting, regarding the painting project for all three buildings. This project encompasses all sides, including the front and rear, and will employ the existing color scheme. Notably, Jason holds previous ties to our community as a resident and owner, having also served as the paint contractor during the last two painting cycles for these buildings. Kindly review […]

New Snow Removal contract

Snow King stating that they will not be servicing our property this winter. I will be happy to take point on getting quotes from other companies if that is ok with the board. Transparency on bids and signing contract with new snow removal contract; Thanks Dave for doing all the work: “My impression from talking with them, is that almost all of their contracts are on a per plow basis, […]

Remaining flooding issues 200 building

After the raising of the porch in front of the 200 building, excessive rain storms have continue to prove flood prone. See the below video where water is pooling in front of the 200 building as it is not adequately draining in the ditch between 200 and 300 building. VIDEO JULY 15th 2022 As it turns out there was a rock choking off the drainage into the ditch. This is […]

Twin Ridge Townhomes heat tape saga.

Dear stakeholders, It is no secret, over the past few years our roofs and the snow have given us quite the headaches. It has cost us money in shoveling, insurance claims filed for leaks due to ice dams and still 2022 was a catastrophic year for electricity costs. Furthermore shoveling details are an outright assault on the lifespan of our roofs. Over the years we thousands have been spent and […]