Stutzman Gerbaz has dug up the broken sewer and repaired the pipe. The soil has been moved back and at a later stage the bus path will be rehabilitated in it’s original state or better.
Monthly Archives: March 2022
4 posts
For the residents affected with the sewer break, Colorado Site Services has delivered a porta potty.
All Valley Resource comes, unblocks the sewer, diagnosis and locates the break. Residents are now able to use water and flush liquids.
Synopsis: March 2nd 2022 there was a sewer break in the 300 building. Water and sewage backed up and one resident had damage inside the unit. Residents were not able to use their facilities for a few days. A port potty was provided for the duration it took to complete the repairs. A plumber unblocked and located the break. Stutzman Gerbaz repaired the break March 9th 2020