Stutzman Gerbaz has dug up the broken sewer and repaired the pipe. The soil has been moved back and at a later stage the bus path will be rehabilitated in it’s original state or better.
Stutsman Gerbaz invoiceYou may also like
Mario and the boys git’r done! Scheduled for Friday Monday May 3oth Cancelled due to snow Saturday, May 28th planned for Monday […]
Today Jason pressure washed buildings 100 and 200 and tomorrow will be working on the 300 building. We are aware that even […]
Josh and Susan for limbing the trees around the cul-de-sac parking island. The work of putting the branches in the dumpster. Thank […]
From HP Roofing: Hi Everybody After todays visit We found must of the roof jacks with damage and in need of repair […]