After the raising of the porch in front of the 200 building, excessive rain storms have continue to prove flood prone. See the below video where water is pooling in front of the 200 building as it is not adequately draining in the ditch between 200 and 300 building.
VIDEO JULY 15th 2022
As it turns out there was a rock choking off the drainage into the ditch.
This is resolved by removing it.
The problem has now been mitigated as after footage verifies
VIDEO AUGUST 28th 2022
Further down lower on the trail a water bar was needed and has been created.