Heat Tape Archive News Welcome Stickies 9-13 sloppy work New heattape – N Side 300 and 200 Building by Danno|Published September 13, 2022 For the Record: Email from board with work order Emails from board commissioning work Email from the board notifying contractor about unsatisfactory workmanship 300 Building Left bight is loose, second to last clip is not attached Each bight only one clip? two clips per bight? Clips present but not used? misplaced Heat tape across on fastened on 1 clip uneven spaced clips, bights, will this hold under snow? Heat tape presents but not on building 200 Heat tape present Two clips per bight, unevenly spaced Left bight loose, why is this going up the side of the roof fastener present just not used created by dji camera Spacing? Tape measure? Chalk line? 200 Building: created by dji camera Goes up 4 shingles Goes up 2 shingles Old or replaced? Heattape betw dormers only 1 fastener Just loose on roof rats nest? 1 clip at the top of bight Old existing or new tape? Old heat tape Chaos!!! REFERENCE WORK: EXISTING HEATTAPE 200 BUILDING Video:
Published June 11, 2022 Signs Update Some of the homeowners have expressed interest in putting up signs on the property in an attempt to relieve us off liability. […]
Published June 11, 2022 Twin Ridge on National Forest land? For quite a while now I have been trying to tell everyone that Twin Ridge is on national forest land. Over and […]
Published October 16, 2023 HP Roofing, 1st visit From HP Roofing: Hi Everybody After todays visit We found must of the roof jacks with damage and in need of repair […]