Sewer Break 300 Bldg 3/2/22

4 posts

All posts pertaining the work and events related to the sewer line break at the 300 building on march 2nd 2022

Synopsis

Synopsis: March 2nd 2022 there was a sewer break in the 300 building. Water and sewage backed up and one resident had damage inside the unit. Residents were not able to use their facilities for a few days. A port potty was provided for the duration it took to complete the repairs. A plumber unblocked and located the break. Stutzman Gerbaz repaired the break March 9th 2020